Distribution Tariffs
Effective: January 1, 2010
Note: The Terms and Conditions for Consumer Service apply to all Town of Fort Macleod customers and provide for other charges.
FTM 100 - Residential Service
Availability: FTM 100 is available to individually metered single family dwelling units that are used for domestic purposes only.
|
| Transmission |
Distribution |
Total Delivery |
| Energy Charge |
|
|
|
| All kWh consumed |
0.00602/kWh |
0.0266/kWh |
0.03261/kWh |
| Daily Charge |
|
|
|
|
0.22908/Day |
0.58044/Day |
0.80953/Day | FTM 100
Application: In addition to single family dwellings, FTM 100 is also available to:
- An individually metered single dwelling unit with a maximum of 1,000 watts used in connection with small business;
- An individually metered single motel rental unit, provided that the owner has contracted with Fort Macleod service to each unit;
- An individually metered private dwelling in a commercial travel trailer or mobile home park, provided that Fort Macleod bills the owner of the park if the occupancy is temporary;
- Multi-residential buildings which are served through a single meter and which are currently billed on a residential rate;
- Senior citizen apartment complexes served through a single meter; or
- Travel trailer or mobile home parks served through a single meter where the owner of the park sub-meters each of the occupants of the park and charges the occupants of the park at rates no higher than Fort Macleod's FTM 100.
In cases 4, 5 and 6 (multi-residential), Fort Macleod bills the customer for the kWh consumed and a revised Basic Monthly Charge of $17.11/month for one unit plus $15.13/month for each additional unit whether or not the units are occupied.
FTM 200 - Small General Service
Eligibility: FTM 200 is available to Small General Service customers who normally require less than 75 kW and do not qualify for other specific rates.
| |
Transmission |
Distribution |
Total Delivery |
| Energy Charge |
|
|
|
| For the first 200 kWh/kW of Demand |
$0.0064/kWh |
$0.0228/kWh |
$0.0292/kWh |
| An additional kWh |
$0.0064/kWh |
- |
$0.0064/kWh |
| Capacity Charge |
|
|
|
| For first 2kW of Demand |
$0.06496/kW/day |
$0.27152/kW/day |
$0.33648/kW/day |
| All additional kW of Demand |
$0.06496/kW/day |
$0.14239/kW/day |
$0.20736/kW/day |
Demand means the maximum amount of energy kW or kVA used at a given instance within a billing period. The kW Demand value (kVA metered demands converted using a factor of 1.1) for the billing period will be the highest of:
- The metered peak for the Current Billing Period;
- The Demand ratchet;
- The minimum Contract Demand;
- The Rate Minimum Demand of 2kW
The Demand ratchet is defined as 85% of the highest metered peak established in the last 365 days ending with the end date of the current billing period, less 50 kW.
FTM 400 - General Service
Eligibility: FTM 400 is available to General Service customers with a normal billing demand of less than 2,000 kW, who do not qualify for other specific rates.
| |
Transmission |
Distribution |
Total Delivery |
| Energy Charge |
|
|
|
| For first 400 kWh/kW of Demand |
$0.00586/kWh |
$0.00494/kWh |
$0.01080/kWh |
| All additional kWh |
$0.00586/kWh |
- |
$0.00586/kWh |
| Capacity Charge |
|
|
|
| For first 50 kW of Demand |
$0.09061/kW/day |
$0.23532/kW/day |
$0.32592/kW/day |
| For the next 450 kW of Demand |
$0.09061/kW/day |
$0.16734/kW/day |
$0.25795/kW/day |
| All additional kW of Demand |
$0.09061/kW/day |
$0.12229/kW/day |
$0.21290/kW/day | FTM 400
Demand means the maximum amount of energy kW or kVA used at a given instance within a billing period. The kW Demand value (kVA metered demands converted using a factor of 1.1) for the billing period will be the highest of:
- The metered peak for the Current Billing Period;
- The Demand ratchet;
- The Minimum Contract Demand;
- The Rate Minimum Demand of 50 kW.
The Demand ratchet is defined as 85% of the highest metered peak established in the last 365 days ending with the end datge of the current billing period.
FTM 500 - Street Lights
Eligibility: FTM-500 is available for standard streetlight and highway lighting fixtures.
Transmission System Access Charge: 1.3457 cents per kWh
Distribution System Usage Charge: 1.9904 cents per kWh
Power Distribution Fee Schedule
Please click here to review the power distribution fee schedule.
|